
From first call to keys in hand.
Every TMH build follows the same clearly staged journey and the same staged payment structure, so you always know what is happening, and when it is due.
Choose your design pathway.
Every TMH home begins with a considered design stage. Depending on what you are looking to achieve, your project follows one of two pathways: a refined, established design, or a fully bespoke one built from the ground up.
TMH Signature Design
$4,187 incl. GST- Best suited to
- Clients who want a refined, proven home from our established range, delivered with certainty and speed.
- Design approach
- Curated selection from our range of floor plans, colour palettes, kitchen layouts and finishes.
- Flexibility
- Configured from our established set options to keep your project streamlined and on budget.
- What is included
- Initial consultation, on-site assessment, site-specific floor plan, side elevations and exterior render, design selection, and a finalised Project Specification Sheet, which forms part of your contract documents.
- On acceptance
- 20% deposit, Construction Payment Schedule, Master Builders fixed-price contract and confirmed manufacturing slot.
TMH Custom Design
$7,750 incl. GST- Best suited to
- Clients who want a fully bespoke home, designed around their site, lifestyle and vision.
- Design approach
- A tailored design developed from the ground up by our building designer and town planner.
- Flexibility
- Up to three design revisions to finalise your floor plans, elevations and exterior renders.
- What is included
- Initial consultation, on-site assessment, design briefing, concept design and renders, a finalised Project Specification Sheet and a formal quotation.
- On acceptance
- 20% deposit, Construction Payment Schedule, Master Builders fixed-price contract and confirmed manufacturing slot.
A guide to your timeframes.
Every TMH build follows the same journey. Council processing and your manufacturing slot are the two variables outside our control. Everything else runs to the schedule shown here.
Fourteen steps, four phases.
Open a phase to see what happens in each step.
1Design and enquiryDay 1 to week 85 steps
Initial enquiry
You speak with our team about your project, budget and goals, and we confirm the pathway that suits your build.
On-site consultation
Our Director visits your site to assess your property and confirm your project is viable and achievable.
Design
Your floor plan, elevations and exterior renders are developed and finalised, with up to three rounds of revisions included.
Selections and specification
You finalise your colour palette, kitchen layout and interior finishes, and your Project Specification Sheet is completed, confirming your inclusions and price.
Acceptance
Your 20% deposit is paid, your Master Builders fixed-price contract is signed, and your build formally moves into approvals.
2Approvals and manufacturingAbout 8 months from enquiry2 steps
Approvals and pre-construction
We manage your Development Application, Building Application, engineering and NatHERS assessment with council, while we procure materials for your build in parallel. Council timeframes vary by municipality and sit outside our control.
Manufacturing queue
Your construction start date is confirmed once your build reaches the front of our manufacturing queue and a factory slot is allocated. We will confirm this date with you as soon as it is locked in.
3Construction12 to 16 weeks4 steps
Frame stage complete
The steel subfloor is constructed and installed, and the structural frame is complete, wall frames erected and roof trusses installed.
Lock-up stage complete
External bracing ply, building wrap and windows and doors are installed, along with cladding, roof sarking and bracing, and roofing iron.
Fixing stage complete
Internal linings are completed, along with electrical and plumbing works to a rough-in. Joinery and flooring are completed, and painting undercoat is applied.
Practical completion (factory)
Your home is complete and ready to leave the factory, with final on-site engineering and installation coordinated ahead of delivery.
4Delivery and handoverUp to 4 weeks after delivery3 steps
Delivery and installation
About two weeks before delivery, we install concrete piers and mark out where your service connections need to be ready. On delivery day your home is transported and craned onto site and secured in place.
On-site completion works
Our team completes the works that can only happen once your home is on site, including decks, stairs, ramps and balustrade, plus the final coat of paint inside and out.
Keys and handover
Once on-site engineering, certification and occupancy sign-off are complete, we hand over your keys, documentation and warranties.
Inside the 12 to 16 weeks.
Your home is built in four stages at our St Helens workshop. Each stage is inspected and invoiced when it is complete, so what you pay always follows what has been built.
Construction payment pathway.
A guide to how your build is staged and invoiced, from preliminary design through to practical completion. Six stages cover 100% of your contract value, each due 5 business days after invoice.
1Preliminary designDue upon engagement$4,187+
A professionally drafted floor plan is prepared to suit your concept, with detailed elevations. Includes a meeting with our Building Designer and Director, and revisions to refine the layout and design intent. The fee depends on your pathway and counts toward your build price.
2DepositDue upon acceptance of final quote20%
Covers your Development Application, including council fees, site survey, geotech and bushfire reports and liaison with council, plus your Building Application, including documentation, NatHERS assessment and liaison with the building surveyor.
3Frame stage completion2 to 3 weeks from construction start25%
The steel subfloor is constructed and installed, and the structural frame is complete: wall frames erected and roof trusses installed.
4Lock-up stage completion4 to 6 weeks from construction start25%
External bracing ply, building wrap, windows and doors are installed, along with cladding, roof sarking and bracing, and roofing iron.
5Fixing stage completion8 to 12 weeks from construction start20%
Internal linings are completed, along with electrical and plumbing works to a rough-in. Joinery, flooring and painting undercoat are completed.
6Practical completion12 to 16 weeks from construction start10%
On-site installation is coordinated, including concrete piers, galvanised posts, transport and cranage, followed by final on-site engineering, certification and occupancy sign-off.
This guide reflects a typical TMH build as currently scoped. Council processing times, your position in our manufacturing queue, site conditions, variations and unforeseen circumstances may affect the timeframes and figures shown. We will keep you updated at every stage.
Ready to start?
