Have a question?
Answers to what we hear most often about pricing, timelines and what it is like to build with TAS Manufactured Housing.
Straight answers.
Cannot find what you are looking for? Ask us directly and a person will answer within 24 hours.
Pricing and getting started
What is the difference between a Signature Design and a Custom Home?
Signature Designs are proven plans from our established range, configured to your site with set finishes and layouts, a faster and more streamlined path to a quality home. Custom Homes are designed from the ground up around your site, lifestyle and vision, with more flexibility over the floor plan itself. Both are built to the same TMH quality standard.
How much does it cost to get started?
A Signature Design starts with a $4,187 (incl. GST) design fee, and a Custom Home starts at $7,750 (incl. GST). Both fees cover your initial consultation, on-site assessment, design work and a finalised Project Specification Sheet, and count toward your overall build price once you sign.
What happens once I accept my quote?
You pay a 20% deposit, sign a Master Builders fixed-price contract, and your project is formally locked into our design and manufacturing queue.
Can I make changes to a Signature Design?
Signature Designs are configured from our established range of floor plans, colour palettes and finishes, which is what keeps them on budget and on schedule. If you want the flexibility to change the floor plan itself, our Custom Home pathway is built for that, with up to three rounds of design revisions included.
The build process
How long does the whole process take, from enquiry to keys?
As a guide: around 8 months from enquiry to building permit (council-dependent), then a variable wait for your manufacturing slot, 12 to 16 weeks of construction once your build starts, and up to 4 weeks of on-site completion works after delivery. Our Process page has the full stage-by-stage timeline.
Do I need to manage council approvals myself?
No. We manage your Development Application, Building Application, engineering and NatHERS assessment with council on your behalf as part of the build.
How is the build staged and paid for?
Payment is split across six stages tied to construction milestones: design fee, deposit, frame, lock-up, fixing and practical completion. Each is invoiced as the stage is completed, and together they cover 100% of your contract value. Full amounts and timing are on our Process page.
What is the manufacturing queue, and why does it vary?
Once your approvals are underway, your build joins our manufacturing queue and your construction start date is confirmed when a factory slot becomes available. We keep you updated as soon as your date is locked in.
Delivery and site
Where do you build and deliver homes?
We are based at our factory in St Helens, Tasmania, and build and deliver homes across the state.
What happens on delivery day?
About two weeks before delivery we install your concrete piers and confirm your service connections are ready. On the day, your home is transported and craned onto site and secured in place, ready for on-site completion works.
What if my site has access or slope challenges?
Our Director visits your site early in the process, during the on-site consultation, to confirm your project is viable and to flag anything that could affect design, delivery or cost before you commit to a quote.
After your build
What is included at handover?
Once on-site engineering, certification and occupancy sign-off are complete, we hand over your keys, full documentation and warranties.
Can I see a completed home before I commit?
Yes. Get in touch through our enquiry form and we can arrange a time for you to view one of our completed homes.