Delivery day.
Your home is built under cover in St Helens, finished to a high standard, then moved to your block in one piece. Here is how that day unfolds.
From our factory to your block.
Because your home is finished before it leaves, delivery is a day on site, not months of building. Four steps take you from a prepared block to the keys.
Your site is made ready
We install your concrete piers and mark out where your service connections need to be ready.
Your home arrives
We leave early in the morning, to keep the impact on the road and your site to a minimum. Your finished home arrives in one piece and is craned into position and secured in place by a team of two.
Finishing on site
Our team completes what can only happen once the home is in place: decks, stairs, ramps, balustrade and the final coat of paint inside and out.
Keys in your hand
Once on-site engineering, certification and occupancy sign-off are complete, you receive your keys, documentation and warranties.

We handle the move. You get the block ready.
We
- Install your piers and posts.
- Scope the route, crane and truck positions beforehand.
- Deliver your home in one piece, with the truck and crane sized to your build.
- Craned and secured by a team of two.
- Complete the on-site works and arrange the final engineering, certification and sign-off.
You
- Keep the site area clear.
- Make sure the gates are unlocked, so we have clear access in and out.
- Have your service connections ready at the points we mark.
- You do not need to be there on the day.
Transport and cranage are not part of your base price. We quote them after your site assessment, once we know your route and crane position. See what it really costs.
The result, on site.
A few homes after delivery, in place and finished.



Good to know.
What if it is windy on the day?
If it is very windy and we know beforehand, we will most likely move delivery to the next day. We do not want to set up everything and then be unable to leave because of the wind.
Is the home always delivered whole?
Yes. Your home is always delivered in one piece. The size of the truck and crane depends on the size of your build.
What happens on delivery day?
Two weeks before delivery we install your concrete piers and confirm your service connections are ready. On the day, your home is transported and craned onto site and secured in place, ready for on-site completion works. Transport and cranage are quoted separately after your site assessment.
What if my site has access or slope challenges?
Our Director visits your site early in the process, during the on-site consultation, to confirm your project is viable and to flag anything that could affect design, delivery or cost before you commit to a quote.
What is included at handover?
Once on-site engineering, certification and occupancy sign-off are complete, we hand over your keys, full documentation and warranties.